jukebox
All repositories: gitoria
797 B
# JB3 / JB3b report: shuffle, now-playing overlay, play counting, albums without folderHalf done. Everything except the keyboard and the run on the real database is finished, merged into main and covered by gates. See STATUS.md and README.md ("Shuffle, the overlay and counting plays") for the behaviour.Gates (all passing): tests/gate.mjs 120, tests/ui.mjs 53 (old folder-based and count checks updated to the new rules), tests/jb3.mjs 50 (shuffle without repeats over the generated 13,459-song database, favourites shuffle respects N, overlay open / close button / swipe down, next and previous, a play counted once at 30 s and not for a song skipped after 1.5 s, CD folding, copies, placeholders).Gap: keyboard, see .scratch/KEYBOARD-GAP.md. Not done: the real-database copy run at 390 px.
Branches
Latest commits
- f2b5db98styles: format styles with nested rules and bare queriesmre
- f036bab4search: format styles with nested rules and bare queriesmre
- ef9a9d4asongs: format styles with nested rules and bare queriesmre
- f22f9aacmain: format styles with nested rules and bare queriesmre
- f56cd7c7Sync icons from 8176eb1 and verify mixed component sourcesmre
- d56e5054Sync theme and shared tokens from layouts 17e0f03mre
- b1362547Re-vendor to Hybriel set day35mre
- 89e10f08Records: mission 002 rollback wordingmre
- 9485dee7Records: mission 002 brief (live step)mre
- 9ba68fe7Records: S1b reviewedmre
- 193dfff1Records: S1 result, S1b startedmre
- 028ed776Records: mission 001 continuation S1bmre
- 1838d7e8Records: S1 startedmre
- a43fca3fRecords: mission 001 decided pointsmre
- 41773828Records: statusmre
- a82c0805Records: mission 001 brief (Style form)mre
- a4bce6d1Records: ticket push subscriptionmre
- 14abde3bjukebox: records: Atlas's records moved to worldapi-conductor/archivemre
- 0433e9a8jukebox: records: gitoria remote added and pushedmre
- 1722d707jukebox: records: repo creation handed to Gitoriamre